Question No: 171 – (Topic 2)

You are a QA tester on a development team. You are responsible for a large number of test cases on your current project.

You need to bulk edit test steps in a large group of test cases. Which tool should you use?

  1. Web Test case Management

  2. Microsoft Excel

  3. Microsoft Visual Studio

  4. Microsoft Test Manager

Answer: A

Explanation: What#39;s new in testing the application in Visual Studio 2013

Question No: 172 DRAG DROP – (Topic 2)

You are using Microsoft Test Manager (MTM) to manage your testing efforts. You want to see how manual testing is going for the current plan.

You need to see a list of manual test runs grouped first by Test Status and then by State.

What should you do? (To answer, move the three appropriate actions from the list of actions to the answer area and arrange them in the correct order.)

Ensurepass 2018 PDF and VCE

Answer:

Ensurepass 2018 PDF and VCE

Explanation:

Box 1: Navigate to the Analyze Test Runs view and select Manual runs. Box 2: Drag the Test Status column header into the group by region.

Box 3: Drag the Status column header into the group by region.

Note:

Ensurepass 2018 PDF and VCE

Question No: 173 – (Topic 2)

You run a manual test on an application by using Microsoft Test Manager (MTM). You have the following testing requirements:

->Collect the diagnostic data from the local machine, and

->Collect the diagnostic data from a remote SQL Server.

You need to identify the components required to configure the test environment to comply with these requirements.

Which two components should you choose? (Each correct answer presents part of the solution. Choose two.)

  1. Configuration variables

  2. Data collectors

  3. Local and remote roles

  4. Build controller

Answer: B,C

Question No: 174 – (Topic 2)

You are using Microsoft Test Manager (MTM). You are using the Microsoft Solution Framework (MSF) for Agile Software Development process template. Your TFS environment includes SharePoint Server 2010 Enterprise Edition and reporting integration.

You need to identify the number of bugs that are open and assigned to you. What should you do?

  1. Open the Track tab in MTM and click the My Assigned Bugs link.

  2. Open the Bugs Dashboard and view the Bug Progress report.

  3. Open a Visual Studio 2012 Command prompt and run the ActiveBugList.exe command, pasting in username as a parameter.

  4. Open the Bugs Dashboard and view the Active Bugs by Assignment report.

Answer: D

Question No: 175 – (Topic 2)

You are using Microsoft Test Manager (MTM) for manual test runs.

You are creating an action recording but some of the recorded actions were not part of the intended steps.

You need to remove only the unwanted actions from the current action recording. What should you do?

  1. Open the test results and save the action log. Edit the action log to remove the unwanted actions. Import the file as an attachment, overwriting the initial action log.

  2. Reset the test case inside the test runner and create a new action log.

  3. Delete the unwanted actions from the captured actions inside the test runner.

  4. Open the test results and edit the action log to remove the unwanted actions.

Answer: C

Question No: 176 – (Topic 2)

You are a test developer using Microsoft Test Manager (MTM). You are editing a test suite in a plan for a product.

You need to change the default configuration setting for the test suite. What should you do?

  1. For the selected test suite, assign a new configuration by choosing select the configuration for all tests.

  2. Change the state on the configuration to Active with add description as Default.

  3. Select the required configuration by choosing select test configuration for all tests for the plan that needs editing,

  4. Check the Assign to new test plans check box in the Test Configuration pane.

Answer: D

Explanation: How to: Create Test Configurations

Question No: 177 – (Topic 2)

You are using Microsoft Test Manager (MTM). You are using the Microsoft Solution Framework (MSF) for Agile Software Development process template. Your team has all required permissions to run the reports on the SharePoint project portal.

You need to track the progress on resolving bugs by your team for the past week. Which Excel report should you run?

  1. Bug Trends

  2. Bugs by Assignment

  3. Run the Team Trend report.

  4. Bug Progress

Answer: A

Question No: 178 – (Topic 2)

You plan to conduct a manual test for an ASP.NET website by using Microsoft Test Manager (MTM). You create a test plan named Calculate_Margin by using Testing Center in MTM.

You need to link all the test cases that belong to the Calculate_Margin test plan with new requirements that are stored as work items in Team Foundation Server 2012.

What should you do?

  1. In the Links section of the test plan, click Add link to associate the requirements document.

  2. Associate the requirements document with the test plan by name, then add a link by using the area path relevant to the requirements being tested.

  3. Create the test cases within the test plan by using a Test Suite, then associate the new requirements by adding them as attachments to the test cases.

  4. Click Add requirements from the Contents menu of the test plan and associate the new

requirements.

Answer: D

Question No: 179 – (Topic 2)

You are using Microsoft Test Manager (MTM). You are using the Microsoft Visual Studio Scrum 1.0 process template.

You need to generate a list of product backlog items (PBI) in MTM that have zero test cases.

What should you do?

  1. Open each PBI and visually inspect the work item links.

  2. Create a requirements-based test suite.

  3. Click Requirements coverage in the Results view.

  4. Create a Direct Links query.

Answer: D

Question No: 180 – (Topic 2)

You are using Microsoft Test Manager (MTM). You have created some shared steps for a recurring test sequence.

You plan to use these shared steps with fast-forward playback in multiple test cases. You need to create an action recording for the shared steps.

What are two possible ways to accomplish this goal? (Each correct answer presents a complete solution. Choose two.)

  1. Include the shared steps work item in the test case. Start running the test case with action recordings enabled. When the shared steps are reached, select Start and record.

  2. Include the shared steps work item in the test case. Right-click the shared steps and click Create action recording.

  3. Open the shared steps work item in Shared Steps Manager and select the tab for Create action recording.

  4. From the Shared Steps Manager, select the shared steps work item and click Create action recording.

Answer: A,D

100% Ensurepass Free Download!
Download Free Demo:70-499 Demo PDF
100% Ensurepass Free Guaranteed!
Download 2018 EnsurePass 70-499 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.